Assembly Facility Opens

Biogen Systems Limited have now completed the commissioning of their new Manufacturing Facility on the Thornton Science Park in Chester, UK. The new facility has the capacity to manufacture up to 100 E4 or E5 CHP systems per annum and has full test facilities to put CHP systems under load conditions to confirm both required minimum output and emissions criteria are met prior to shipping to site.

The facility shares the University of Chesters Science at Thornton near Ellesmere Port with a number of energy and Renewables start-ups . Biogen Systems have also setup a fuel preparation and assessment capability consisting of a Pilot Feedstock Preparation Facility in St Helens and specialist Fuel testing capability within the University’s Departments of Chemical Engineering and Natural Sciences.

For more details contact This email address is being protected from spambots. You need JavaScript enabled to view it. or phone +44 (0)1244 568 976

Get in Touch

Biogen Systems Ltd
Thornton Science Park
Pool Lane
Ince
Chester
Cheshire
CH2 4NU

+44 (0)1244 568 976

Charity Partners

charity partner logos

facebook twitter google-plus

© 2019 Biogen Systems   |   Privacy Policy   |   Website Design by Make it Seen Media

Menu